NO. 1 BALLSBRIDGE

Published on in / Blog / by .

Tritech Engineering have secured the mechanical services contract to deliver 3 No.  commercial offices, 8 No. retail units & 88 No. premium apartments over two basement levels.

One Ballsbridge consists of 3 distinctive buildings consisting of 155,400 sq ft of premium Grade A office space designed to the highest specification (LEED Gold accreditation) and 88 prestigious residential apartments.

One Ballsbridge is being developed by The Comer Group. Construction is underway and scheduled for completion in Q2 2017. 

Techcrete Manufacturing Plant

Published on in / Blog / by .

Techcrete is the largest company in the design, manufacture and supply of architectural precast cladding to the UK and Irish construction markets.

Tritech Engineering completed the mechanical services installation to the 10,000m2 manufacturing plant including rain water harvesting ring main throughout the production facility, compressed air central plant and distribution, natural gas services to unit heaters, heat recovery ventilation and air conditioning to the office space. Cylon BEMS system.

Scope of works;
Mechanical Services Installation


Project Team

Architect: James Smith Architects

M/E Consultant: Dave Dickinson Associates

Main Contractor: P Elliott & Co.

Project Duration: 3 Months

Value: €350,000

Lisheen Nursing Home

Published on in / Blog / by .

Tritech Engineering completed the mechanical services contract for a 60 bedroom standalone extension & associated living accommodation. All works were undertaken in a live nursing home environment without disruption to the daily operations of the health care facility.

The mechanical engineering services comprises of LTHW systems serving underfloor heating & LST radiator circuits, water services, 24m2 solar input to the DHW, heat recovery ventilation to all areas, air conditioning of the living accommodation & BEMS system.

Scope of works

  • Mechanical services

Project Team

Client: Lisheen Nursing Home
Architect: John Morris

M/E Consultant: Tritech (Design & Build)
Main Contractor: BCL
Project Duration: Eight Months
Value: €500,000

Kiltipper Woods Nursing Home

Published on in / Blog / by .

Tritech Engineering completed the mechanical services contract for a 24 bedroom extension & associated living accommodation, hydrotherapy pool and canteen/coffee shop. All works were undertaken in a live nursing home environment without disruption to the daily operations of the health care facility.

The mechanical engineering services comprises of LTHW systems serving underfloor heating & LST radiator circuits, DHW & AHU circuits. Heat recovery ventilation to the living accommodation, Central AHU's to the hydrotherapy pool and coffee shop, medical gas installations & BEMS system.

Scope of works

  • Mechanical services

Project Team

Client: Kiltipper Woods
Architect: G.I. Martin Architects
M/E Consultant: JRA
Main Contractor: MDY Construction
Project Duration: Five Months
Value: €500,000

Workday

Published on in / Blog / by .

Tritech Engineering was appointed the mechanical services contract for the fit out of Kings Building, 152-155 Church Street, Dublin 7.  This project consisted of the fit-out of office space on ground, fourth fifth & sixth floors. The project was delivered in 2 phases with phase 1 fast-tracked delivering 80% of the contract in 12 weeks.

Scope of works

Mechanical Services Installation:

  • Fan Coil Units, new, relocation of existing & removals.
  • CHW & LTHW piped services.
  • Condensate pipework.
  • Close control units to comms room & tech rooms.
  • Water, Drainage & Ventilation Services to Ground Floor Showers & Micro Kitchens.
  • Heat recovery ventilation to all office floors.
  • Utility Tie Ins c/w Management of Application To Landlord For Consent.
  • BMS Controls.
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: MCA

M/E Consultant: ARUP Consulting Engineers

Main Contractor: Structure Tone

Project Duration: Six Months

Value: €1,400,000

Loughan House

Published on in / Blog / by .


Loughan house is a correctional facility situated in Cavan. The facility is designed to rehabilitate inmates and prepare them for integration into their own communities. As part of this rehabilitation process they are provided with education programmes.

Tritech was appointed the mechanical services contract on this leading edge education facility. The brief was to provide 250 inmates with an educational facility which not only provided their basic educational requirements similar to a traditional school building but to provide this with safety and security paramount in importance.

Multiple technical teaching rooms and associated equipment were provided in line with the facilities teaching programmes; woodwork rooms, metalwork rooms, building skills, industrial cleaning, light industrial, music rooms, science labs, home economics & are rooms.

The building was constructed using modular technology to ensure delivery of a high quality building on a fast track programme.

Scope of works

Mechanical Services Installation

  • LPHW installation including wood-chip boiler plant.
  • Gas, Water & Ventilation Services to Kitchen.
  • Heat Recovery Ventilation.
  • Above Ground Drainage
  • Lead Co-ordinator for all Specialist Services

Project Team

Client: Irish Prison Services
Architect: Paul Monaghan Architects
M/E Consultant: Dervan Consulting Engineers
Main Contractor: Glenbeigh Construction
Project Duration: Six Months
Value: €350,000

Ashling Hotel

Published on in / Blog / by .

Tritech Engineering was appointed as the mechanical services contractor for the Ashling Hotel redevelopment. This project comprised of the demolition of the original 4 storey hotel building fronting onto Parkgate street & the construction of a new modern eight storey hotel building comprising ground & basement floor public facilities and 134 no. bedrooms.

Scope of works
Design & Build, Mechanical Services Installation

  • VRF Air conditioning to all rooms with local & central control & water cooled condensors.
  • Heat dissipation circuit & dry coolers
  • Gas, Water & Ventilation Services to Kitchen.
  • LTHW services
  • Heat recovery ventilation
  • Boosted Water & fusion waste services
  • Syphonic rainwater installation
  • Under floor heating
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: O’ Dwyer & Associates
M/E Consultant: Damery & Associates
Main Contractor: Ellen Construction
Project Duration: 6 Months
Value: €1,700,000

Castlepark School

Published on in / Blog / by .

Castle Park was founded in 1904 & as part of the School’s Centenary Development Plan, 2004, it was decided to renew all of the school buildings, to provide unrivalled indoor educational and sports facilities and at the same time to redevelop the outdoor amenities of this wonderful fifteen acre campus.

Tritech Engineering was appointed as Mechanical “Design & Build” contractor for the redevelopment. The redevelopment included services upgrade of the existing castle (protected structure) & new extension including a Montessori and a primary section, assembly hall, swimming pool, changing areas, commercial kitchen and administration rooms & sports hall (Gym).  The outstanding new facilities were opened in September 2008 and today’s pupils enjoy a world class educational facility.

Scope of works
Design & Build, Mechanical Services Installation

  • LPHW.
  • Gas, Water & Ventilation Services to Kitchen.
  • Air Handling to swimming pool, assembly hall, kitchen & changing areas
  • Close control units to comms room.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: Smith Kennedy Architects
M/E Consultant: Tritech Engineering (design review by WYG)
Main Contractor: Cleary Doyle
Project Duration: 6 Months
Value: €850,000