tritech.ie http://tritech.ie/ en-us tritech.ie copyright 2018, tritech.ie 2018-05-26 http://tritech.ie/harvest-market-t2-dublin-airport Harvest Market, T2 Dublin Airport

HMS Host are the worlds largest provider of food and beverage services for business & pleasure travellers. The company has over 33,000 associates & annual revenues in excess of $2.7 Billion.

Tritech Maintenance division provide PPM and reactive support on the following services;

  • Air Conditioning
  • Mechanical Ventilation
  • Kitchen Ventilation Duct Cleaning
  • Ansul Fire Suppression
  • UV Kitchen Canopies
  • Building Management System
  • Gas Detection & Gas Proving
  • Grease Traps
  • Fire Extinguishers

]]>
Harvest Market, T2 Dublin Airport delaney 2017-09-05 http://tritech.ie/modules/comments/?doc_id=3534&module_name=sitetext
http://tritech.ie/2-4-merrion-row 2-4 Merrion Row

Tritech Maintenance Division provide PPM and reactive support to Aramark Property Services Ltd at 2-4 Merrion row on the following building services;

  • LTHW Gas Boilers
  • Gas Fired Water Heaters
  • Gas Detection Systems
  • System Circulating Pumps
  • Pressurisation & Expansion Equipment
  • Building Management Systems
  • Heat Recovery Ventilation
  • Air Handling units
  • Chillers
  • Solar PV System
  • Water Storage
  • Fan Coil Units
  • Extract Ventilation
]]>
2-4 Merrion Row delaney 2017-09-05 http://tritech.ie/modules/comments/?doc_id=3525&module_name=sitetext
http://tritech.ie/swift-square-buildings-1-2 Swift Square Buildings 1&2

Tritech Maintenance Division provide contracted PPM and reactive support on the following services for Savills at Buildings 1 & 2 Swift Square;

  • LTHW Boilers
  • Gas Fired Water Heaters
  • Gas Detection Systems
  • System Circulating Pumps
  • Pressurisation & Expansion Equipment
  • Building Management Systems
  • Heat Recovery Ventilation
  • Air Handling units
  • Chillers
  • Solar Systems
  • Smoke Vents
  • Fire Safety Systems
  • Water Treatment
  • Air Conditioning including system overhaul

]]>
Swift Square Buildings 1&2 delaney 2017-09-05 http://tritech.ie/modules/comments/?doc_id=3507&module_name=sitetext
http://tritech.ie/the-reflector-building-8-hanover-quay The Reflector Building, Hanover Quay Tritech mechanical division has commenced the shell and core & CAT A fitout on this project. The Reflector is a six storey over basement office building extending to 123,000sq.ft net area. The finish specification is of the highest standards, featuring  LEED Gold V4 accreditation and A3 BER Certification. A residential block of 40 apartments will also be constructed. John Sisk & Sons are the main contractor for the developer, Park Developments. The project will be delivered to BIM level 2 and Tritech Engineering will lead the services coordination. The project will be delivered by Q3, 2018.   

]]>
The Reflector Building, Hanover Quay delaney 2017-08-31 http://tritech.ie/modules/comments/?doc_id=3470&module_name=sitetext
http://tritech.ie/institute-of-education Institute Of Education Tritech Engineering completed enabling works and provision of mechanical services for a 2000m2, four floor over basement extension for John Paul Construction. The project was delivered in 2015.

Scope of works
Mechanical Services Installation

  • Enabling Works including the relocation of AC units, gas services, radiators, ventilation plant, etc..
  • New incoming gas service to existing plantroom & new plantroom.
  • Rainwater Harvesting.
  • LPHW to all trench heating & radiators.
  • Fire smoke dampers and associated control panel retrofit to all existing ventilation.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: John Fleming Architects

M/E Consultant: Varming Consulting Engineers

Main Contractor: John Paul Construction

Project Duration: 6 Months

Value: €450,000


   

]]>
Institute Of Education delaney 2016-09-06 http://tritech.ie/modules/comments/?doc_id=3342&module_name=sitetext
http://tritech.ie/no-1-ballsbridge NO. 1 BALLSBRIDGE

Tritech Engineering have secured the mechanical services contract to deliver 3 No.  commercial offices, 8 No. retail units & 88 No. premium apartments over two basement levels.

One Ballsbridge consists of 3 distinctive buildings consisting of 155,400 sq ft of premium Grade A office space designed to the highest specification (LEED Gold accreditation) and 88 prestigious residential apartments.

One Ballsbridge is being developed by The Comer Group. Construction is underway and scheduled for completion in Q2 2017. 

]]>
NO. 1 BALLSBRIDGE wbi 2016-09-06 http://tritech.ie/modules/comments/?doc_id=3310&module_name=sitetext
http://tritech.ie/capital-dock Capital Dock

Tritech Engineering has secured the contract to deliver mechanical services to 190 premium riverside apartments. Kennedy Wilson are developing Capital Dock Campus. At 4.8 acres it is a city within a city. The development consists of grade A offices, premium riverside apartments along with unique amenities and public spaces. The construction phase has commenced and is on schedule for a Q4 2018 handover.

]]>
Capital Dock delaney 2016-09-06 http://tritech.ie/modules/comments/?doc_id=3301&module_name=sitetext
http://tritech.ie/hubspot-dublin HubSpot Dublin

Tritech Engineering delivered the mechanical services element of the works contract for the HubSpot's new headquarters in One Docklands Central. This project provides for the high specification fit-out across 2 floors of office space. The fit-out includes office areas consisting of cellular and open plan layouts, fitness room, on-site pub & arcade games, conference rooms, collaboration spaces, nomad desks and rooftop terrace.

Scope of works


Mechanical Services Installation:

  • CHW & LPHW to Waterside Controlled Fan Coil Units.
  • Close control units to comms room.
  • Gas, Water & Ventilation Services to Canteen.
  • Heat recovery ventilation to all office floors.
  • Trend BMS
  • Lead Co-ordinator for all specialist services.


Project Team


M/E Consultant: Ethos Consulting Engineers

Main Contractor: Management & Construction Ltd

Project Duration: 3 Months

Value: €950,000

]]>
HubSpot Dublin delaney 2016-09-06 http://tritech.ie/modules/comments/?doc_id=3293&module_name=sitetext
http://tritech.ie/temple-bar-hotel Temple Bar Hotel

Tritech Engineering was awarded the electrical services element for the works contract for the refurbishment of The Temple Bar Hotel. The project covered of the redevelopment of the 138 bedrooms, corridors, reception, bars & restaurants. The works were completed in an occupied environment and was spread over 5 floors.

Scope of Works

  • Lighting
  • Addressable Emergency Lighting
  • General Services
  • Distribution Board Upgrades
  • Fire Detection & Emergency Call Systems
  • Mechanical Services
  • TV/Phone Networks

Project Team

Main Contractor: Structure Tone

M&E Consultant: JV Tierney

Architect: Henry J Lyons

Project Duration: 3 months

Value: €1,200,000

]]>
Temple Bar Hotel delaney 2016-07-29 http://tritech.ie/modules/comments/?doc_id=3224&module_name=sitetext
http://tritech.ie/one-docklands-central One Docklands Central

This project consisted of the decommissioning and removal of the existing mechanical installation to the landlord core areas, reception & plant rooms . Upgrade of the main reception, toilet core areas at each floor level & showering facilities. The installation of new main plant including boilers, Heat recovery ventilation, Fan coil units & BMS controls.

Scope of works

Mechanical Services Installation:

  • LPHW plant upgrade including boilers, flues, pumps and associated pipe connections.
  • Provision of FCU's to all landlord levels including CHW, LPHW secondary air ducting, linear grilles, swirl diffusers, etc.
  • Provide energy meters to all tenant floors.
  • Close control units to comms room & tech rooms
  • Soil, Water & Ventilation Services to landlord areas including toilets facilities..
  • Flushing, chlorination & chemical treatment of all site services.
  • Reception area upgrade including .
  • Trend BMS installation.

Project Team

Architect: RKD
M/E Consultant: Ethos Consulting Engineers
Main Contractor: Management & Construction Ltd
Project Duration: 5 Months
Value: €700,000 circ.

]]>
One Docklands Central delaney 2016-07-07 http://tritech.ie/modules/comments/?doc_id=3159&module_name=sitetext
http://tritech.ie/orwell-nursing-home Orwell Nursing Home

Tritech Engineering completed both mechanical and electrical services installation to a 50 bedroom nursing home extension along with 36 sheltered living accommodation units above a basement car park. 

The mechanical engineering services comprises of LTHW systems serving LST radiator circuits, DHW & AHU circuits. Heat recovery ventilation to bedrooms & DX cooling to day care, exhaust systems, close control units to comms room, water & waste services, medical gas installations, fire fighting services & BEMS system.

The electrical engineering services comprises of internal & external lighting, emergency lighting, main & sub mains distribution boards, fire detection system, phone, data & TV networks, nurses call system, intruder alarm, CCTV & access control, mechanical & BMS wiring.

Scope of works

  • Mechanical & Electrical services

Project Team

Client: Orwell Healthcare
Architect:
M/E Consultant: Johnson & Reid Associates
Main Contractor: John Paul Construction
Project Duration: Twelve Months
Value: €2,200,000

]]>
Orwell Nursing Home delaney 2016-07-07 http://tritech.ie/modules/comments/?doc_id=3144&module_name=sitetext
http://tritech.ie/techcrete-manufacturing-plant Techcrete Manufacturing Plant

Techcrete is the largest company in the design, manufacture and supply of architectural precast cladding to the UK and Irish construction markets.

Tritech Engineering completed the mechanical services installation to the 10,000m2 manufacturing plant including rain water harvesting ring main throughout the production facility, compressed air central plant and distribution, natural gas services to unit heaters, heat recovery ventilation and air conditioning to the office space. Cylon BEMS system.

Scope of works;
Mechanical Services Installation


Project Team

Architect: James Smith Architects

M/E Consultant: Dave Dickinson Associates

Main Contractor: P Elliott & Co.

Project Duration: 3 Months

Value: €350,000

]]>
Techcrete Manufacturing Plant wbi 2016-02-04 http://tritech.ie/modules/comments/?doc_id=3052&module_name=sitetext
http://tritech.ie/lisheen-nursing-home Lisheen Nursing Home

Tritech Engineering completed the mechanical services contract for a 60 bedroom standalone extension & associated living accommodation. All works were undertaken in a live nursing home environment without disruption to the daily operations of the health care facility.

The mechanical engineering services comprises of LTHW systems serving underfloor heating & LST radiator circuits, water services, 24m2 solar input to the DHW, heat recovery ventilation to all areas, air conditioning of the living accommodation & BEMS system.

Scope of works

  • Mechanical services

Project Team

Client: Lisheen Nursing Home
Architect: John Morris

M/E Consultant: Tritech (Design & Build)
Main Contractor: BCL
Project Duration: Eight Months
Value: €500,000

]]>
Lisheen Nursing Home wbi 2016-02-04 http://tritech.ie/modules/comments/?doc_id=3034&module_name=sitetext
http://tritech.ie/kiltipper-woods-nursing-home Kiltipper Woods Nursing Home

Tritech Engineering completed the mechanical services contract for a 24 bedroom extension & associated living accommodation, hydrotherapy pool and canteen/coffee shop. All works were undertaken in a live nursing home environment without disruption to the daily operations of the health care facility.

The mechanical engineering services comprises of LTHW systems serving underfloor heating & LST radiator circuits, DHW & AHU circuits. Heat recovery ventilation to the living accommodation, Central AHU's to the hydrotherapy pool and coffee shop, medical gas installations & BEMS system.

Scope of works

  • Mechanical services

Project Team

Client: Kiltipper Woods
Architect: G.I. Martin Architects
M/E Consultant: JRA
Main Contractor: MDY Construction
Project Duration: Five Months
Value: €500,000

]]>
Kiltipper Woods Nursing Home wbi 2016-02-04 http://tritech.ie/modules/comments/?doc_id=3014&module_name=sitetext
http://tritech.ie/airport-hangar-upgrades Dublin Airport Hangar Upgrades

Tritech Engineering completed a mechanical services upgrade of Hangars 2-5 Dublin airport with PJ Hegarty & Sons. over a two year period commencing April 2010.

Scope of works
Mechanical Services :


  • LTHW system modification & Upgrade.
  • Natural gas services upgrade.
  • Mechanical ventilation upgrade.
  • Radiant panel alterations.
  • Air Conditioning.
  • Compressed air services alterations.
  • Fire suppression systems.
  • Water & waste services alterations.
  • P.L.C. controls modifications.

Project Team

Client: DAA

Main Contractor: PJ Hegarty & Sons

M+E Consultant: PM Group

Duration: 24 months (3 phases)

Value: €1,000,000

]]>
Dublin Airport Hangar Upgrades delaney 2016-02-04 http://tritech.ie/modules/comments/?doc_id=2989&module_name=sitetext
http://tritech.ie/griffith-college-academic-facilities-building Griffith College, Academic Facilities Building

Griffith College is Ireland's leading private college with campuses in Dublin, Cork & Limerick.

Tritech Engineering completed a “Design & Build” mechanical services installation for the development of a large multi-functional academic facilities building incorporating a 600 seat conference hall, lecture rooms, meeting rooms, restaurant & commercial kitchen. 

Scope of works
Design & Build, Mechanical Services Installation

  • LPHW.
  • Gas, Water & Ventilation Services to Kitchen & restaurant.
  • Air Handling to conference hall , kitchen & changing areas
  • Close control units to comms room.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team


Main Contractor: PJ Hegarty & Co.

Project Duration: 12 Months

Value: €1,300,000

]]>
Griffith College, Academic Facilities Building delaney 2016-02-03 http://tritech.ie/modules/comments/?doc_id=2972&module_name=sitetext
http://tritech.ie/hms-host-harvest-market-t2-dublin-airport HMS Host, Harvest Market, T2, Dublin Airport

HMSHost are the worlds largest provider of food and beverage services for business & pleasure travellers. The company has over 33,000 associates & annual revenues in excess of $2.7 Billion. With locations in over 100 airports worldwide including Dublin, Shannon & Cork, the deliver the finest food and beverage experience.

Tritech Engineering completed the mechanical services contract for the Market Hall restaurant in T2, Dublin Airport.  

Scope of works

Mechanical Services Installation :

  • CHW & LPHW alterations.
  • Gas, Water & Ventilation Services to Kitchen.
  • Ventilation to restaurant.
  • Fusion welded drainage.
  • Python containment to bar.
  • Cylon BMS.
  • Lead Co-ordinator for all specialist services.

Project Team

Project Managers: Denis McCague & Associates

M/E Consultant: JAK Consulting Engineers

Main Contractor: Alan Nuttall Ltd

Project Duration: Four Months

Value: €400,000 circ.

]]>
HMS Host, Harvest Market, T2, Dublin Airport delaney 2016-02-03 http://tritech.ie/modules/comments/?doc_id=2950&module_name=sitetext
http://tritech.ie/first-care-beneavin-house-nursing-home First Care, Beneavin House Nursing Home

Tritech Engineering was appointed the mechanical contract for Beneavin House nursing home. Beneavin House was constructed in 2009 consisting of four storey accommodation including 123 single & 4 double ensuite rooms, commercial kitchen, basement car park.

The mechanical engineering services comprises of LTHW systems serving LST radiator circuits, DHW & AHU circuits. Central AHU’s with DX cooling to day care and kitchen areas, exhaust systems, close control units to comms room, water & waste services, medical gas installations & BEMS system.

Scope of works

  • Mechanical services

Project Team

Client: First Care
Architect: G.I. Martin Architects
M/E Consultant: WYG
Main Contractor: EHA Group
Project Duration: Ten Months
Value: €1,250,000

]]>
First Care, Beneavin House Nursing Home delaney 2016-02-02 http://tritech.ie/modules/comments/?doc_id=2865&module_name=sitetext
http://tritech.ie/apc-ltd APC Ltd

Tritech Engineering was appointed as mechanical services contractor for new pharma facility comprising laboratories and associated support rooms, cellular office space, meeting rooms & canteen.

The mechanical engineering services comprises of energy efficient VRF air conditioning system to all office areas, mechanical heat recovery ventilation, chemical fume cupboards & associated exhaust systems, close control units to comms room, water services, medical gas installations.

The project was designed with a high level of M&E co-ordination including 3D scanning, Revit MEP modelling (BIM).

Scope of works

Mechanical Services Contract

Project Team

Client: APC Ltd
Architect: RKD Architects
M/E Consultant: T5 Partnerships
Main Contractor: Clancy Construction
Project Duration: Three Months
Value: €1,400,000 circ.

]]>
APC Ltd delaney 2016-02-01 http://tritech.ie/modules/comments/?doc_id=2828&module_name=sitetext
http://tritech.ie/fas-training-centre-cabra FAS Training Centre, Cabra

Scope of Works

Dali Controlled Lighting

Addressable Emergency Lighting

Fire Detection System

BMS Controls

General services


Project Team

Main Contractor: Walls Construction

M/E Consultants: Homan O'Brien

Contract Value: €90,000

]]>
FAS Training Centre, Cabra delaney 2016-01-28 http://tritech.ie/modules/comments/?doc_id=2769&module_name=sitetext
http://tritech.ie/dundrum-college-of-further-education Dundrum College of Further Education

Tritech Engineering acted as PSCS for the Electrical installation & building works at Dundrum College.

Scope of Works

Distribution Board

General Services

Internal & External Lighting

Phone & Data Networks

UPS System

Fire Detection

Intruder, CCTV & Access Control

BMS Controls

Building Works

Project Team

Main Contractor: Tritech Engineering

M/E Consultants: McCarrick Woods

Contract Value: €240,000

]]>
Dundrum College of Further Education delaney 2016-01-28 http://tritech.ie/modules/comments/?doc_id=2757&module_name=sitetext
http://tritech.ie/holy-faith-sisters-haddington-place Holy Faith Sisters, Haddington Place

Haddington Place is a new convent building consisting of three stories over basement.

Scope of Works

Mechanical & Electrical Services Contract

  • Internal & External Lighting
  • Distribution Boards
  • General Services
  • Fire Detection & Disable Refuge Systems
  • Data/Phone & TV Networks
  • Nurses Call & Induction Loops
  • Intruder, CCTV & Access Control Systems
  • Under floor Heating
  • Water Services, Soil & Wastes
  • Solar collector
  • Heat Recovery Ventilation
  • Protective Services
  • BMS Controls


Project Team

Main Contractor: Cedar Building Company

M/E Consultants: Axis Engineering

Contract Value: €450,000

]]>
Holy Faith Sisters, Haddington Place delaney 2016-01-28 http://tritech.ie/modules/comments/?doc_id=2742&module_name=sitetext
http://tritech.ie/santa-sabina-nursing-home Santa Sabina Nursing Home

Scope of Works

Internal & External Lighting

Fire Detection System

Data/Phone & TV Networks

Nurses Call System

Intruder, CCTV & Access Control Systems

BMS Controls

Project Team

Main Contractor: Duggan Brothers

M/E Consultants: NJ O'Gorman & Associates

Contract Value: €288,000

]]>
Santa Sabina Nursing Home delaney 2016-01-28 http://tritech.ie/modules/comments/?doc_id=2727&module_name=sitetext
http://tritech.ie/connaught-house-herbert-st Connaught House, Herbert St

This project included a Category A fit-out of the 2nd & 3rd floors, including Lighting, General Services and Fire Detection. It also contained a full electrical fit-out of the ground floor reception, landlord areas and basement. Access Control, including a Speed Lane System, CCTV and Fire Detection was installed throughout the premises.

Project Team

Client: Jones Lang LaSalle

M&E Consultant: Seha

Main Contractor: T&I Fit-Outs

Value:€410,000

]]>
Connaught House, Herbert St delaney 2016-01-28 http://tritech.ie/modules/comments/?doc_id=2702&module_name=sitetext
http://tritech.ie/dublin-aerospace Dublin Aerospace

Dublin Aerospace is based at Dublin International Airport. They operate a 4 bay base maintenance facility catering for 70 large aircraft per annum, APU overhaul centre & landing gear service centre

Tritech Engineering was appointed for the process services installation for the plating shop. The plating shop caters for chrome, cadmium & nickel plating, nital etch, heat treatment, machining, NDT and painting services.

Scope of works
Mechanical & Process Services :


  • Process compressed air.
  • Process solvent extracts for hot fumes and water vapour produced in the process tanks.
  • Makeup tempered air handling unit.
  • PLC controlled tank lid operation.
  • Gas services to AHU & plating lines.
  • Water services to plating lines & rinse tanks.
  • LTHW & CHW serivces.
  • HVAC to ancillary areas.
  • Fire hose reel installation.

Project Team

Client: Dublin Aerospace

Main contractor: PJ Hegarty & Sons

M/E Consultant: PM Group

Project Duration: 4 Months
Value: €650,000 circ.

]]>
Dublin Aerospace delaney 2015-11-20 http://tritech.ie/modules/comments/?doc_id=2614&module_name=sitetext
http://tritech.ie/central-park-1 Central Park

Block K, Central Park is the latest building to be developed within the Central Park Complex. The project consists of two underground basement levels, a mezzanine level for retail & office use and three residential towers consisting of 166 apartments over eleven floors. The gross building area is 32,000m2 and handover is scheduled for Summer 2016.

Scope of works
Mechanical Services Installation :

  • Individual LTHW heating to all apartments.
  • Gas, Water & Ventilation Services to apartments.
  • Fire fighting services to basement and wet risers in the building blocks.
  • Suspended drainage & rainwater in basement.
  • BMS energy monitoring.
  • Smart controls in residential units.
  • Lead Co-ordinator for all specialist services.

Scope of works

Client: Kennedy Wilson Europe

Architect: Henry J Lyons

Project Managers: Kerrigan Sheanon Newman

M/E Consultant: Axis Consulting Engineers

Main Contractor: John Sisk & Sons

Project Duration: 15 Months

Value: €2, 800,000

]]>
Central Park delaney 2015-11-20 http://tritech.ie/modules/comments/?doc_id=2591&module_name=sitetext
http://tritech.ie/workday Workday

Tritech Engineering was appointed the mechanical services contract for the fit out of Kings Building, 152-155 Church Street, Dublin 7.  This project consisted of the fit-out of office space on ground, fourth fifth & sixth floors. The project was delivered in 2 phases with phase 1 fast-tracked delivering 80% of the contract in 12 weeks.

Scope of works

Mechanical Services Installation:

  • Fan Coil Units, new, relocation of existing & removals.
  • CHW & LTHW piped services.
  • Condensate pipework.
  • Close control units to comms room & tech rooms.
  • Water, Drainage & Ventilation Services to Ground Floor Showers & Micro Kitchens.
  • Heat recovery ventilation to all office floors.
  • Utility Tie Ins c/w Management of Application To Landlord For Consent.
  • BMS Controls.
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: MCA

M/E Consultant: ARUP Consulting Engineers

Main Contractor: Structure Tone

Project Duration: Six Months

Value: €1,400,000

]]>
Workday wbi 2015-11-05 http://tritech.ie/modules/comments/?doc_id=2415&module_name=sitetext
http://tritech.ie/utv-ireland UTV Ireland

Tritech Engineering were awarded the Mechanical Services element of the works contract for the new UTV Ireland in Macken House. This project provides for a state of the art TV production studio and office space. Comprising of studios, editing suites, open plan office, meeting rooms & pods. This fit out provided an open ceiling design with exposed mech & elec services requiring a detailed level of coordination.

Scope of works
Mechanical Services Installation:

  • VRF Air Conditioning.
  • Close control units to comms room.
  • Gas, Water & Ventilation Services to Canteen.
  • Heat recovery ventilation.
  • Acoustic management
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: MCA

M/E Consultant: Metec Consulting Engineers

Main Contractor: Mac Interiors

Project Duration: 3 Months

Value: €550,000

]]>
UTV Ireland delaney 2015-11-05 http://tritech.ie/modules/comments/?doc_id=2406&module_name=sitetext
http://tritech.ie/loughan-house Loughan House

Loughan house is a correctional facility situated in Cavan. The facility is designed to rehabilitate inmates and prepare them for integration into their own communities. As part of this rehabilitation process they are provided with education programmes.

Tritech was appointed the mechanical services contract on this leading edge education facility. The brief was to provide 250 inmates with an educational facility which not only provided their basic educational requirements similar to a traditional school building but to provide this with safety and security paramount in importance.

Multiple technical teaching rooms and associated equipment were provided in line with the facilities teaching programmes; woodwork rooms, metalwork rooms, building skills, industrial cleaning, light industrial, music rooms, science labs, home economics & are rooms.

The building was constructed using modular technology to ensure delivery of a high quality building on a fast track programme.

Scope of works

Mechanical Services Installation

  • LPHW installation including wood-chip boiler plant.
  • Gas, Water & Ventilation Services to Kitchen.
  • Heat Recovery Ventilation.
  • Above Ground Drainage
  • Lead Co-ordinator for all Specialist Services

Project Team

Client: Irish Prison Services
Architect: Paul Monaghan Architects
M/E Consultant: Dervan Consulting Engineers
Main Contractor: Glenbeigh Construction
Project Duration: Six Months
Value: €350,000

]]>
Loughan House wbi 2015-11-03 http://tritech.ie/modules/comments/?doc_id=2201&module_name=sitetext
http://tritech.ie/marquette-restaurant Marquette Restaurant

A NEW FOOD market style restaurant in The Loop at Terminal 1, Dublin Airport. The food market and bar, Marqette, offers locally sourced, organic produce and fresh artisan breads, catering to 5,000 people daily. This project consisted of the decommissioning and removal of the existing mechanical installation and the installation of new main plant including exhaust ventilation fans, heat recovery air handling equipment, hot water generation, water storage tank and boosting & BMS controls. Commercial kitchen catering for a restaurant capacity of 260 people.

Scope of works


Mechanical Services Installation :

  • CHW & LPHW alterations.
  • Gas, Water & Ventilation Services to Kitchen.
  • Ventilation to restaurant.
  • Fusion welded drainage.
  • Python containment to bar.
  • Cylon BMS.
  • Lead Co-ordinator for all specialist services.

Project Team

Project Managers: Gardiner & Theobald
M/E Consultant: JAK Consulting Engineers
Main Contractor: Glenbeigh Construction
Project Duration: Four Months
Value: €500,000 circ.

]]>
Marquette Restaurant delaney 2015-10-28 http://tritech.ie/modules/comments/?doc_id=2115&module_name=sitetext
http://tritech.ie/ashling-hotel Ashling Hotel

Tritech Engineering was appointed as the mechanical services contractor for the Ashling Hotel redevelopment. This project comprised of the demolition of the original 4 storey hotel building fronting onto Parkgate street & the construction of a new modern eight storey hotel building comprising ground & basement floor public facilities and 134 no. bedrooms.

Scope of works
Design & Build, Mechanical Services Installation

  • VRF Air conditioning to all rooms with local & central control & water cooled condensors.
  • Heat dissipation circuit & dry coolers
  • Gas, Water & Ventilation Services to Kitchen.
  • LTHW services
  • Heat recovery ventilation
  • Boosted Water & fusion waste services
  • Syphonic rainwater installation
  • Under floor heating
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: O’ Dwyer & Associates
M/E Consultant: Damery & Associates
Main Contractor: Ellen Construction
Project Duration: 6 Months
Value: €1,700,000

]]>
Ashling Hotel wbi 2015-10-21 http://tritech.ie/modules/comments/?doc_id=1978&module_name=sitetext
http://tritech.ie/wyckham-point Wyckham Point

Block 1, Wycham Point is a residential development of 185 apartments over a podium basement shared with two additional blocks. Tritech Engineering was appointed as Mechanical contractor for block 1 construction.

Scope of works
Mechanical Services Installation :

  • Individual LPHW heating to all apartments.
  • Gas, Water & Ventilation Services to apartments.
  • Fire rated ducting to basement lobbies.
  • Suspended drainage & rainwater in basement.
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: McCrossan O’Rourke Manning
M/E Consultant: Johnson & Reid Associates
Main Contractor: Dorville Homes
Project Duration: 10 Months
Value: €1, 950,000

]]>
Wyckham Point delaney 2015-10-19 http://tritech.ie/modules/comments/?doc_id=1935&module_name=sitetext
http://tritech.ie/ulster-bank Ulster Bank

Tritech Engineering was selected by PJ Hegarty & Co as Mechanical & Electrical Services Contractor for the refurbishment of Ulster Bank Branches nationwide. The works were primarily design & build for both branch & business centres. We carried out over 40 branch refurbishments for Ulster Bank & First Active throughout the country. The projects ranged from service enhancements to complete refurbishments. Method of procurement was negotiated & each project was reviewed by the client’s project managers (MACE).

Scope of works
Mechanical & Electrical Services Installation :

  • VRV Air Conditioning.
  • Close control units to comms room.
  • Gas, Water & Ventilation Services to Canteen.
  • Heat recovery ventilation.
  • Cylon BMS & mechanical control wiring
  • General power
  • Lighting, lighting controls & emergency lighting.
  • UPS & Containment
  • Access control
  • Fire detection

Project Team

Architect: Joseph Doyle & Associates
M/E Consultant: Tritech Engineering
Main Contractor: PJ Hegarty & Co
Project Duration: 2004 to 2008
Value: €12,000,000 circ.

]]>
Ulster Bank delaney 2015-10-19 http://tritech.ie/modules/comments/?doc_id=1929&module_name=sitetext
http://tritech.ie/mgs-manufacturing MGS Manufacturing

Tritech Engineering was appointed as mechanical & electrical services contractor for the development of a new manufacturing facility situated on Hewlett Packard’s, Liffeypark Technology Campus, Leixlip, Co. Kildare. MGS Manufacturing Group is a leading global provider of optimized manufacturing solutions for high precision plastic products - with services including: engineering & design, mould making, injection moulding & value-added operations.

This project was delivered over 3 concurrent phases as follows;
Phase 1 – Manufacturing hall with services columns for 16 injection mounding machines.
Phase 2 – Manufacturing hall displacement ventilation system & 3 story office building.
Phase 3 – Extension of the process network including a clean room area.

Scope of works
Mechanical & Electrical services :

  • Process CHW, stainless steel grade.
  • Process compressed air
  • Process pipe rack, service columns & clad
  • Chemical water treatment system
  • Displacement ventilation system to manufacturing hall
  • VRV Air Conditioning to offices.
  • Close control units to comms room.
  • Water & Ventilation Services to offices.
  • Heat recovery ventilation.
  • Cylon BMS & mechanical control wiring
  • General power to process columns, dryers & tool room
  • Lighting, lighting controls & emergency lighting.
  • UPS & Containment
  • Data installation
  • Fire detection

Project Team

Client: MGS Manufacturing (Ireland)
Architect: NJ O’ Gorman & Associates
M/E Consultant: NJ O’ Gorman & Associates
Project Duration: 18 Months
Value: €1,450,000 circ.

]]>
MGS Manufacturing delaney 2015-10-19 http://tritech.ie/modules/comments/?doc_id=1925&module_name=sitetext
http://tritech.ie/cherry-orchard Cherry Orchard

Tritech Engineering was appointed the mechanical contract for two single storey community nursing homes. The units were constructed off site using system build technology for the HSE with a combined floor area of 55,000 sq ft buildings to fulfil the HSE requirements for community nursing facilities and to combat the spread of infection providing modern high specification public health care facilities for elderly and high care dependency patients.

The mechanical engineering services comprises of LTHW systems serving LST radiator circuits, DHW & AHU circuits. Central AHU’s with DX cooling to day care and kitchen areas, exhaust systems, close control units to comms room, water & waste services, medical gas installations & BEMS system.

Scope of works

  • Mechanical services

Project Team

Client: HSE
Architect: PMCA
M/E Consultant: Axis Engineering
Main Contractor: Glenbeigh Construction
Project Duration: Ten Months
Value: €1,500,000

]]>
Cherry Orchard delaney 2015-10-19 http://tritech.ie/modules/comments/?doc_id=1920&module_name=sitetext
http://tritech.ie/castlepark-school Castlepark School

Castle Park was founded in 1904 & as part of the School’s Centenary Development Plan, 2004, it was decided to renew all of the school buildings, to provide unrivalled indoor educational and sports facilities and at the same time to redevelop the outdoor amenities of this wonderful fifteen acre campus.

Tritech Engineering was appointed as Mechanical “Design & Build” contractor for the redevelopment. The redevelopment included services upgrade of the existing castle (protected structure) & new extension including a Montessori and a primary section, assembly hall, swimming pool, changing areas, commercial kitchen and administration rooms & sports hall (Gym).  The outstanding new facilities were opened in September 2008 and today’s pupils enjoy a world class educational facility.

Scope of works
Design & Build, Mechanical Services Installation

  • LPHW.
  • Gas, Water & Ventilation Services to Kitchen.
  • Air Handling to swimming pool, assembly hall, kitchen & changing areas
  • Close control units to comms room.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: Smith Kennedy Architects
M/E Consultant: Tritech Engineering (design review by WYG)
Main Contractor: Cleary Doyle
Project Duration: 6 Months
Value: €850,000

]]>
Castlepark School wbi 2015-10-19 http://tritech.ie/modules/comments/?doc_id=1916&module_name=sitetext
http://tritech.ie/alltech Alltech

Tritech Engineering was appointed a mechanical & electrical services contractor for new European bio-research facility comprising laboratories, marketing and administration building together with alterations to the existing building.

The mechanical and electrical engineering services comprises of specialist lighting design for the Conference Rooms and Board Rooms, the latest PIR control energy efficient 4 Pipe fan coil unit air conditioning system, LPHW & CHW systems, mechanical heat recovery ventilation, chemical fume cupboards & associated exhaust systems, close control units to comms room, water services (including well water and rainwater usage), UPS installation, lift installation, medical gas installations, data and communication, AV installation, generator, general power etc.

The project was designed with a high level of M&E co-ordination including Revit modelling (BIM) of plant rooms.

Scope of works

Mechanical & Electrical Services

Project Team

Client: Alltech (Ireland)
Architect: Fitzgerald & Associates
M/E Consultant: Metec Consulting Engineers
Main Contractor: John Paul Construction
Project Duration: Twelve Months
Value: €1,900,000 circ.

]]>
Alltech delaney 2015-10-19 http://tritech.ie/modules/comments/?doc_id=1912&module_name=sitetext
http://tritech.ie/adroll Adroll

Tritech Engineering was awarded the M&E Services element of the works contract for the new AdRoll headquarters in Burlington Plaza, Burlington road, Dublin 4. This project provides for the high specification fit-out across 2 floors of office space. This project has been designed to achieve an energy efficient services installation. The fit-out includes 2 floor of office areas consisting of cellular and open plan layouts with air side controlled fan coil units in an open ceiling design.

Scope of works
Mechanical & Electrical Services Installation:

  • CHW & LPHW to Air Side Controlled Fan Coil Units.
  • Close control units to comms room.
  • Gas, Water & Ventilation Services to Canteen.
  • Heat recovery ventilation to all office floors.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.
  • General electrical services
  • Lighting, lighting controls & emergency lighting.
  • UPS & Containment
  • Access control
  • Fire detection

Project Team

Architect: RKD
M/E Consultant: SEHA Technical Services
Main Contractor: Connect Project Management Ltd
Project Duration: 3 Months
Value: €950,000 (2 phases)

]]>
Adroll delaney 2015-10-19 http://tritech.ie/modules/comments/?doc_id=1907&module_name=sitetext
http://tritech.ie/paddy-power Paddy Power

This project consisted of the decommissioning and removal of the existing mechanical installation over 6 floors totaling 120,000 sq ft and the installation of new main plant including chillers, heat recovery air handling equipment, boiler plant & BMS controls. The office areas consisted of cellular and open plan layouts with active multi service chilled beams. Unique requirements included broadcasting radio studios, TV studio and staff restaurant with full commercial kitchen for 900 plus staff.

Scope of works

Mechanical Services Installation:

  • CHW & LPHW to 300 Multi Service chilled beams, Fan Coil Units & Associated Plant Areas.
  • Close control units to comms room & tech rooms
  • Gas, Water & Ventilation Services to Kitchen & Canteen.
  • Heat recovery ventilation to all office floors
  • FM200 Fire Suppression to comms room.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: RKD
M/E Consultant: Delap & Waller
Main Contractor: Creative Space Services
Project Duration: Six Months
Value: €3,000,000 circ.

]]>
Paddy Power delaney 2015-10-19 http://tritech.ie/modules/comments/?doc_id=1897&module_name=sitetext