Tritech Projects

Tritech - News

The Reflector Building, Hanover Quay

Published on in / Blog / by .

Tritech mechanical division has commenced the shell and core & CAT A fitout on this project. The Reflector is a six storey over basement office building extending to 123,000sq.ft net area. The finish specification is of the highest standards, featuring  LEED Gold V4 accreditation and A3 BER Certification. A residential block of 40 apartments will also be constructed. John Sisk & Sons are the main contractor for the developer, Park Developments. The project will be delivered to BIM level 2 and Tritech Engineering will lead the services coordination. The project will be delivered by Q3, 2018.   

NO. 1 BALLSBRIDGE

Published on in / Blog / by .

Tritech Engineering have secured the mechanical services contract to deliver 3 No.  commercial offices, 8 No. retail units & 88 No. premium apartments over two basement levels.

One Ballsbridge consists of 3 distinctive buildings consisting of 155,400 sq ft of premium Grade A office space designed to the highest specification (LEED Gold accreditation) and 88 prestigious residential apartments.

One Ballsbridge is being developed by The Comer Group. Construction is underway and scheduled for completion in Q2 2017. 

HubSpot Dublin

Published on in / Blog / by .

Tritech Engineering delivered the mechanical services element of the works contract for the HubSpot's new headquarters in One Docklands Central. This project provides for the high specification fit-out across 2 floors of office space. The fit-out includes office areas consisting of cellular and open plan layouts, fitness room, on-site pub & arcade games, conference rooms, collaboration spaces, nomad desks and rooftop terrace.

Scope of works


Mechanical Services Installation:

  • CHW & LPHW to Waterside Controlled Fan Coil Units.
  • Close control units to comms room.
  • Gas, Water & Ventilation Services to Canteen.
  • Heat recovery ventilation to all office floors.
  • Trend BMS
  • Lead Co-ordinator for all specialist services.


Project Team


M/E Consultant: Ethos Consulting Engineers

Main Contractor: Management & Construction Ltd

Project Duration: 3 Months

Value: €950,000

One Docklands Central

Published on in / Blog / by .

This project consisted of the decommissioning and removal of the existing mechanical installation to the landlord core areas, reception & plant rooms . Upgrade of the main reception, toilet core areas at each floor level & showering facilities. The installation of new main plant including boilers, Heat recovery ventilation, Fan coil units & BMS controls.

Scope of works

Mechanical Services Installation:

  • LPHW plant upgrade including boilers, flues, pumps and associated pipe connections.
  • Provision of FCU's to all landlord levels including CHW, LPHW secondary air ducting, linear grilles, swirl diffusers, etc.
  • Provide energy meters to all tenant floors.
  • Close control units to comms room & tech rooms
  • Soil, Water & Ventilation Services to landlord areas including toilets facilities..
  • Flushing, chlorination & chemical treatment of all site services.
  • Reception area upgrade including .
  • Trend BMS installation.

Project Team

Architect: RKD
M/E Consultant: Ethos Consulting Engineers
Main Contractor: Management & Construction Ltd
Project Duration: 5 Months
Value: €700,000 circ.

Connaught House, Herbert St

Published on in / Blog / by .

This project included a Category A fit-out of the 2nd & 3rd floors, including Lighting, General Services and Fire Detection. It also contained a full electrical fit-out of the ground floor reception, landlord areas and basement. Access Control, including a Speed Lane System, CCTV and Fire Detection was installed throughout the premises.

Project Team

Client: Jones Lang LaSalle

M&E Consultant: Seha

Main Contractor: T&I Fit-Outs

Value:€410,000

Workday

Published on in / Blog / by .

Tritech Engineering was appointed the mechanical services contract for the fit out of Kings Building, 152-155 Church Street, Dublin 7.  This project consisted of the fit-out of office space on ground, fourth fifth & sixth floors. The project was delivered in 2 phases with phase 1 fast-tracked delivering 80% of the contract in 12 weeks.

Scope of works

Mechanical Services Installation:

  • Fan Coil Units, new, relocation of existing & removals.
  • CHW & LTHW piped services.
  • Condensate pipework.
  • Close control units to comms room & tech rooms.
  • Water, Drainage & Ventilation Services to Ground Floor Showers & Micro Kitchens.
  • Heat recovery ventilation to all office floors.
  • Utility Tie Ins c/w Management of Application To Landlord For Consent.
  • BMS Controls.
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: MCA

M/E Consultant: ARUP Consulting Engineers

Main Contractor: Structure Tone

Project Duration: Six Months

Value: €1,400,000

UTV Ireland

Published on in / Blog / by .

Tritech Engineering were awarded the Mechanical Services element of the works contract for the new UTV Ireland in Macken House. This project provides for a state of the art TV production studio and office space. Comprising of studios, editing suites, open plan office, meeting rooms & pods. This fit out provided an open ceiling design with exposed mech & elec services requiring a detailed level of coordination.

Scope of works
Mechanical Services Installation:

  • VRF Air Conditioning.
  • Close control units to comms room.
  • Gas, Water & Ventilation Services to Canteen.
  • Heat recovery ventilation.
  • Acoustic management
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: MCA

M/E Consultant: Metec Consulting Engineers

Main Contractor: Mac Interiors

Project Duration: 3 Months

Value: €550,000

Adroll

Published on in / Blog / by .

Tritech Engineering was awarded the M&E Services element of the works contract for the new AdRoll headquarters in Burlington Plaza, Burlington road, Dublin 4. This project provides for the high specification fit-out across 2 floors of office space. This project has been designed to achieve an energy efficient services installation. The fit-out includes 2 floor of office areas consisting of cellular and open plan layouts with air side controlled fan coil units in an open ceiling design.

Scope of works
Mechanical & Electrical Services Installation:

  • CHW & LPHW to Air Side Controlled Fan Coil Units.
  • Close control units to comms room.
  • Gas, Water & Ventilation Services to Canteen.
  • Heat recovery ventilation to all office floors.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.
  • General electrical services
  • Lighting, lighting controls & emergency lighting.
  • UPS & Containment
  • Access control
  • Fire detection

Project Team

Architect: RKD
M/E Consultant: SEHA Technical Services
Main Contractor: Connect Project Management Ltd
Project Duration: 3 Months
Value: €950,000 (2 phases)

Paddy Power

Published on in / Blog / by .

This project consisted of the decommissioning and removal of the existing mechanical installation over 6 floors totaling 120,000 sq ft and the installation of new main plant including chillers, heat recovery air handling equipment, boiler plant & BMS controls. The office areas consisted of cellular and open plan layouts with active multi service chilled beams. Unique requirements included broadcasting radio studios, TV studio and staff restaurant with full commercial kitchen for 900 plus staff.

Scope of works

Mechanical Services Installation:

  • CHW & LPHW to 300 Multi Service chilled beams, Fan Coil Units & Associated Plant Areas.
  • Close control units to comms room & tech rooms
  • Gas, Water & Ventilation Services to Kitchen & Canteen.
  • Heat recovery ventilation to all office floors
  • FM200 Fire Suppression to comms room.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: RKD
M/E Consultant: Delap & Waller
Main Contractor: Creative Space Services
Project Duration: Six Months
Value: €3,000,000 circ.