Comhaltas Ceoiltóirí, Belgrave Square

Published on in / Blog / by .

Tritech Engineering carried out the electrical services element of the refurbishment of Comhaltas Ceoiltóirí, Belgrave Square.

The electrical installation comprised of alterations to the main distribution board, installation of emergency lighting, sub-mains cabling, general services, IT / Data networks, mechanical control wiring, security and fire detection systems.

Scope of works

  • Distribution Boards
  • Sub-Mains Cabling
  • General Services
  • IT / Data Networks
  • Fire Detection System
  • Security System
  • Mechanical Control Wiring

Project Team

Client: Comhaltas Ceoiltoiri

M/E Consultant: JV Tierney & Co.

Main Contractor: Tritech Engineering

Project Duration: 2 months

Coláiste Eanna

Published on in / Blog / by .

Tritech Engineering carried out the electrical services element of the refurbishment of Coláiste Eanna, Rathfarnham.

The electrical engineering services comprised of the replacement of the main distribution board, replacement of the sub-main distribution boards, installation of sub-mains cabling, installation of containment, alterations to the existing fire detection system and associated building works.

Scope of works

  • Main & Sub-Main Distribution Boards
  • Sub-Mains Cabling
  • Containment
  • Fire Detection System

Project Team

Client: CDVEC

M/E Consultant: JV Tierney & Co.

Main Contractor: Tritech Engineering

Project Duration: 2 months

Bishop Shanahan National School, Templeogue

Published on in / Blog / by .

Tritech Engineering carried out the electrical services installation for the boiler house refurbishment in Bishop Shanahan National School.

The electrical engineering services comprised of decommissioning the existing MCC panel & associated electrical equipment, installing a new MCC panel, distribution boards, lighting, general services and wiring of heating systems.

Scope of works

  • MCC Panel
  • Distribution Boards
  • Lighting
  • General Services
  • Wiring of Heating Systems

Project Team

Client: Bishop Shanahan National School

M/E Consultant: JV Tierney & Co.

Main Contractor: Tritech Engineering

Project Duration: 4 months

Thomas Street Student Accommodation

Published on in / Blog / by .

Tritech Engineering was awarded the electrical services contract for the new build development and refurbishment of the existing student building. The project consisted of 257 bedrooms, communal and recreational areas.

Scope of Works

  • Internal & External Lighting
  • Emergency Lighting
  • General Services
  • Distribution Boards
  • Fire Detection & Refuge Systems
  • Disabled Call System
  • Intruder Alarm, CCTV and Access Control Systems
  • Mechanical and BMS Controls
  • IT / Data and TV Networks

Project Team

Main Contractor: John Paul Construction

M&E Consultant: Ethos Engineering

Architect: Mahony Pike

Project Duration: 12 months

Value: €1,850,000

Institute Of Education

Published on in / Blog / by .

Tritech Engineering completed enabling works and provision of mechanical services for a 2000m2, four floor over basement extension for John Paul Construction. The project was delivered in 2015.

Scope of works
Mechanical Services Installation

  • Enabling Works including the relocation of AC units, gas services, radiators, ventilation plant, etc..
  • New incoming gas service to existing plantroom & new plantroom.
  • Rainwater Harvesting.
  • LPHW to all trench heating & radiators.
  • Fire smoke dampers and associated control panel retrofit to all existing ventilation.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: John Fleming Architects

M/E Consultant: Varming Consulting Engineers

Main Contractor: John Paul Construction

Project Duration: 6 Months

Value: €450,000


   

Griffith College, Academic Facilities Building

Published on in / Blog / by .

Griffith College is Ireland's leading private college with campuses in Dublin, Cork & Limerick.

Tritech Engineering completed a “Design & Build” mechanical services installation for the development of a large multi-functional academic facilities building incorporating a 600 seat conference hall, lecture rooms, meeting rooms, restaurant & commercial kitchen. 

Scope of works
Design & Build, Mechanical Services Installation

  • LPHW.
  • Gas, Water & Ventilation Services to Kitchen & restaurant.
  • Air Handling to conference hall , kitchen & changing areas
  • Close control units to comms room.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team


Main Contractor: PJ Hegarty & Co.

Project Duration: 12 Months

Value: €1,300,000

FAS Training Centre, Cabra

Published on in / Blog / by .

Scope of Works

Dali Controlled Lighting

Addressable Emergency Lighting

Fire Detection System

BMS Controls

General services


Project Team

Main Contractor: Walls Construction

M/E Consultants: Homan O'Brien

Contract Value: €90,000

Dundrum College of Further Education

Published on in / Blog / by .


Tritech Engineering acted as PSCS for the Electrical installation & building works at Dundrum College.

Scope of Works

Distribution Board

General Services

Internal & External Lighting

Phone & Data Networks

UPS System

Fire Detection

Intruder, CCTV & Access Control

BMS Controls

Building Works

Project Team

Main Contractor: Tritech Engineering

M/E Consultants: McCarrick Woods

Contract Value: €240,000

Castlepark School

Published on in / Blog / by .

Castle Park was founded in 1904 & as part of the School’s Centenary Development Plan, 2004, it was decided to renew all of the school buildings, to provide unrivalled indoor educational and sports facilities and at the same time to redevelop the outdoor amenities of this wonderful fifteen acre campus.

Tritech Engineering was appointed as Mechanical “Design & Build” contractor for the redevelopment. The redevelopment included services upgrade of the existing castle (protected structure) & new extension including a Montessori and a primary section, assembly hall, swimming pool, changing areas, commercial kitchen and administration rooms & sports hall (Gym).  The outstanding new facilities were opened in September 2008 and today’s pupils enjoy a world class educational facility.

Scope of works
Design & Build, Mechanical Services Installation

  • LPHW.
  • Gas, Water & Ventilation Services to Kitchen.
  • Air Handling to swimming pool, assembly hall, kitchen & changing areas
  • Close control units to comms room.
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: Smith Kennedy Architects
M/E Consultant: Tritech Engineering (design review by WYG)
Main Contractor: Cleary Doyle
Project Duration: 6 Months
Value: €850,000