Tritech Engineering was selected by PJ Hegarty & Co as Mechanical & Electrical Services Contractor for the refurbishment of Ulster Bank Branches nationwide. The works were primarily design & build for both branch & business centres. We carried out over 40 branch refurbishments for Ulster Bank & First Active throughout the country. The projects ranged from service enhancements to complete refurbishments. Method of procurement was negotiated & each project was reviewed by the client’s project managers (MACE).

Scope of works
Mechanical & Electrical Services Installation :

  • VRV Air Conditioning.
  • Close control units to comms room.
  • Gas, Water & Ventilation Services to Canteen.
  • Heat recovery ventilation.
  • Cylon BMS & mechanical control wiring
  • General power
  • Lighting, lighting controls & emergency lighting.
  • UPS & Containment
  • Access control
  • Fire detection

Project Team

Architect: Joseph Doyle & Associates
M/E Consultant: Tritech Engineering
Main Contractor: PJ Hegarty & Co
Project Duration: 2004 to 2008
Value: €12,000,000 circ.