Temple Bar Hotel

Published on in / Blog / by .

Tritech Engineering was awarded the electrical services element for the works contract for the refurbishment of The Temple Bar Hotel. The project covered of the redevelopment of the 138 bedrooms, corridors, reception, bars & restaurants. The works were completed in an occupied environment and was spread over 5 floors.

Scope of Works

  • Lighting
  • Addressable Emergency Lighting
  • General Services
  • Distribution Board Upgrades
  • Fire Detection & Emergency Call Systems
  • Mechanical Services
  • TV/Phone Networks

Project Team

Main Contractor: Structure Tone

M&E Consultant: JV Tierney

Architect: Henry J Lyons

Project Duration: 3 months

Value: €1,200,000

Ashling Hotel

Published on in / Blog / by .

Tritech Engineering was appointed as the mechanical services contractor for the Ashling Hotel redevelopment. This project comprised of the demolition of the original 4 storey hotel building fronting onto Parkgate street & the construction of a new modern eight storey hotel building comprising ground & basement floor public facilities and 134 no. bedrooms.

Scope of works
Design & Build, Mechanical Services Installation

  • VRF Air conditioning to all rooms with local & central control & water cooled condensors.
  • Heat dissipation circuit & dry coolers
  • Gas, Water & Ventilation Services to Kitchen.
  • LTHW services
  • Heat recovery ventilation
  • Boosted Water & fusion waste services
  • Syphonic rainwater installation
  • Under floor heating
  • Cylon BMS
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: O’ Dwyer & Associates
M/E Consultant: Damery & Associates
Main Contractor: Ellen Construction
Project Duration: 6 Months
Value: €1,700,000