The Reflector Building, Hanover Quay

Published on in / Blog / by .

Tritech mechanical division has commenced the shell and core & CAT A fitout on this project. The Reflector is a six storey over basement office building extending to 123,000sq.ft net area. The finish specification is of the highest standards, featuring  LEED Gold V4 accreditation and A3 BER Certification. A residential block of 40 apartments will also be constructed. John Sisk & Sons are the main contractor for the developer, Park Developments. The project will be delivered to BIM level 2 and Tritech Engineering will lead the services coordination. The project will be delivered by Q3, 2018.   

NO. 1 BALLSBRIDGE

Published on in / Blog / by .

Tritech Engineering have secured the mechanical services contract to deliver 3 No.  commercial offices, 8 No. retail units & 88 No. premium apartments over two basement levels.

One Ballsbridge consists of 3 distinctive buildings consisting of 155,400 sq ft of premium Grade A office space designed to the highest specification (LEED Gold accreditation) and 88 prestigious residential apartments.

One Ballsbridge is being developed by The Comer Group. Construction is underway and scheduled for completion in Q2 2017. 

Capital Dock

Published on in / Blog / by .

Tritech Engineering has secured the contract to deliver mechanical services to 190 premium riverside apartments. Kennedy Wilson are developing Capital Dock Campus. At 4.8 acres it is a city within a city. The development consists of grade A offices, premium riverside apartments along with unique amenities and public spaces. The construction phase has commenced and is on schedule for a Q4 2018 handover.

Central Park

Published on in / Blog / by .

Block K, Central Park is the latest building to be developed within the Central Park Complex. The project consists of two underground basement levels, a mezzanine level for retail & office use and three residential towers consisting of 166 apartments over eleven floors. The gross building area is 32,000m2 and handover is scheduled for Summer 2016.

Scope of works
Mechanical Services Installation :

  • Individual LTHW heating to all apartments.
  • Gas, Water & Ventilation Services to apartments.
  • Fire fighting services to basement and wet risers in the building blocks.
  • Suspended drainage & rainwater in basement.
  • BMS energy monitoring.
  • Smart controls in residential units.
  • Lead Co-ordinator for all specialist services.

Scope of works

Client: Kennedy Wilson Europe

Architect: Henry J Lyons

Project Managers: Kerrigan Sheanon Newman

M/E Consultant: Axis Consulting Engineers

Main Contractor: John Sisk & Sons

Project Duration: 15 Months

Value: €2, 800,000

Wyckham Point

Published on in / Blog / by .

Block 1, Wycham Point is a residential development of 185 apartments over a podium basement shared with two additional blocks. Tritech Engineering was appointed as Mechanical contractor for block 1 construction.

Scope of works
Mechanical Services Installation :

  • Individual LPHW heating to all apartments.
  • Gas, Water & Ventilation Services to apartments.
  • Fire rated ducting to basement lobbies.
  • Suspended drainage & rainwater in basement.
  • Lead Co-ordinator for all specialist services.

Project Team

Architect: McCrossan O’Rourke Manning
M/E Consultant: Johnson & Reid Associates
Main Contractor: Dorville Homes
Project Duration: 10 Months
Value: €1, 950,000