Tritech Engineering were appointed as Mechanical Services contractor for a CAT B fitout of 235,000sq/ft of premium office space. The complexity of the design by RKD required extensive adaptions to the mechanical & electrical installations. This three phase project required a high degree of accuracy in the coordination of services therefore Tritech, as lead coordinator, utilised 3d point cloud scanning technology to ensure we had an accurate record of the existing Cat A installation before we delivered clash free installation drawings.

The Mechanical scope included;

  • Fan Coil Units, new and relocation of existing
  • CHW & LTHW piped services
  • Condensate pipework
  • Close control units to IDF & MDF comms rooms
  • Water, Drainage & Ventilation Services to kitchen/canteen facility
  • Heat recovery ventilation to all office floors
  • Utility Tie Ins c/w Management of Application To Landlord For Consent
  • BMS Controls
  • Lead BIM Co-ordinator to level 3, exposed services design

Project Team 

Client: Indeed

Main Contractor: Structuretone

M&E Consultant: Metec Consulting Engineers

Value: €5,000,000