The HSE appointed Tritech Group as Main Contractor for a complete refurbishment of the Annexe building. This 3 story listed building required extensive upgrade works to meet current fire regulations and HSE guidelines. The project consists of 12 wards (48 bed), HTM compliant en-suites bathrooms, staff facilities, office & storage facilities. The project was delivered as an essential services project in the fight against COVID-19. Works Commenced in August 2020 and was delivered on programme in November 2020.

Construction works include;

  • Structural enhancements
  • Fire proofing
  • Below ground drainage & site services
  • Asbestos removal
  • Roof & external structure repairs
  • Partitioning, ceilings
  • IPS Panels
  • Fire doors
  • Flooring
  • Painting & decoration

MEP Services include;

  • Medical gases
  • LTHW distribution & LST radiators
  • MHRV
  • Smoke ventilation
  • Water & waste services
  • BMS
  • Lighting, Lighting controls & Emergency Lighting
  • Power distribution including bed head trunking
  • Fire Alarm
  • Access Control
  • Nurse call
  • Structured cabling installation

Project TeamĀ 

Client: HSE Estates

Main Contractor: Tritech Group

Architect: JNP Architects

M&E Consultant: T5 Consulting Engineers

Fire Consultant: FCC Fire Cert Ltd

Quantity Surveyors: Desmond MacGreevy & Partners